Building Tomorrow Together

 
Quality of Life Bond

Quality of Life - Westside Regional Pool

 

On December 10th, 2014, the City of El Paso’s Engineering and Construction Management Departmetn in conjunction with In*Situ Architecture hosted the fourth and final design community meeting for the new Westside Pool, which will be located at 650 Wallenberg Drive in west El Paso near Mesa Hills Drive.

At the fourth meeting In*Situ presented the final pool concept, which included the layout for the building housing the pool with its various amenities and services. The final design also incorporated input received from the United States of America Swimming (USAS), which is the national governing body for swimming in the United States.


FOR MORE INFORMATION:
ISMAEL GALVEZ
PROJECT MANAGER 
(915) 212-1800
GALVEZIX@ELPASOTEXAS.GOV

What Do You Think?

*required
Name*:
E-Mail*:
Comment*:

El 10 de diciembre del 2014, el Departamento de Ingeniería y Administración de Construcción en conjunción con la empresa de planificación In*Situ presentó la cuarta y última reunión comunitaria de diseño para la Piscina Regional del Oeste. Esta piscina estará localizada en 650 de la Calle Wallenberg en el Oeste de El Paso cerca de la calle Mesa Hills.

En la cuarta reunión, In*Situ presentó el diseño final de la piscina el cual incluyó la ubicación del edificio con sus diferentes servicios y comodidades. El diseño final también incorporó los comentarios que fueron recibidos de la organización de Natación de los Estados Unidos (USAS), que es el cuerpo gobernante de natación en los Estados Unidos..

PARA MÁS INFORMACIÓN:
ISHMAEL GALVEZ
GERENTE DEL PROYECTO
(915) 212-1800
GALVEZIX@ELPASOTEXAS.GOV

What Do You Think?

*required
Name*:
E-Mail*:
Comment*:

 
City Departments On The Web